Earthquake-Prone Buildings
Managing earthquake-prone buildings
Changes to the system managing earthquake-prone buildings came into effect at the end of 2019.
These changes make it easier for EPB owners in small towns to undertake modest building work, without having to start seismic strengthening work at the same time.
The purpose of the ‘substantial’ alteration provisions in the EPB system is to promote positive and progressive upgrades of EPBs within the statutory timeframes.
The previous definition of a substantial alteration had a disproportionate impact on provincial and small towns where there are many low-value buildings. This discouraged modest and progressive building work from being undertaken in these areas.
To be considered ‘substantial’ and mean that seismic strengthening needs to be done at the same time, the value of an alteration now needs to be greater than $150,000. This is in addition to the existing criteria – that the work needs a building consent, and that it (together with other work consented in the last two years) has an estimated value of at least 25 per cent of the building’s value.
Buying or selling an earthquake-prone building
Whoever purchases the building becomes responsible for the seismic strengthening. It’s recommended that purchasers carry out independent investigations prior to purchasing a property that is likely to be earthquake-prone.
If you need to find out whether a building is earthquake-prone you can approach an engineer to undertake an independent Initial Seismic Assessment (ISA) at your own cost. This will give you a guide as to the strength of the building. The Council maintains the right to review these findings.
Alterations to an earthquake-prone building
If Council receives a building consent application for upgrading or alteration to a building which is confirmed as being earthquake-prone, the building will need to be strengthened to comply as much as is reasonably practicable with the current Building Code.
If you are changing the use of the building, we must be satisfied with the structural and seismic performance of a building when considering the intended change of use. If we are not satisfied, the building will need to be strengthened to comply as much as is reasonably practicable with the current Building Code.
Disagreeing with an earthquake-prone classification
If you disagree with our classification of your building as earthquake-prone, you can provide an engineer’s report in challenge of that decision. The Ministry of Business, Innovation and Employment will then make a final, binding determination on whether your building is earthquake-prone.
The policy affects all types of commercial or public buildings, and residential properties that have two or more storys and contain three or more household units. Buildings that are mainly used for residential purposes are not affected by the policy. Buildings built after 1976 are unlikely to be earthquake prone.