Monday 9 November 2026 - 9am to 10am
Clutha District Council’s contractor Andrew Haulage 2011 Ltd will be doing planned maintenance on the Balclutha water network in Clyde Street.
This requires a water shutdown that will affect some properties (see map below) on Monday 9 November 2026 from 9am until approximately 10am.
Our contractor will be working to minimise disruption. In the event of bad weather or other unforeseen circumstances, this work may be rescheduled.
We apologise for any inconvenience this may cause and thank you for your cooperation and understanding.
Should you experience any additional difficulties, please ring Council on 0800 801 350.
What you should do to be ready:
In preparation, please fill your own containers with water to ensure you have enough to meet your needs during the water shutdown.
We’ll do everything we can to restore your water supply as soon as possible, but please be aware that if things do not go as anticipated, it is possible that your water may be off for longer. Please make sure you have enough water put aside in case this happens.
What to do once your water supply is restored:
It’s likely you won’t need to do anything, but sometimes water works can stir up sediment in the pipes. If you notice that your water is discoloured, please turn on one outside tap and run it for 20 minutes or until the water runs clear.